Expect to see some drilling and other mysterious activity happening along part of the Evans Bay coastline over the next few weeks as we test rock and ground conditions to help design stronger sections of seawall, and new bike and walking paths.
From pre-European ara (paths) all the way to Let’s Get Wellington Moving and everything in between. The story of Wellington streets and their use is very much a story of the city itself.
Work has begun in Ōwhiro Bay to complete the trial of beach grading by removing material posing significant risk to the area during storms and big swells.